Since 2006, Wisson Hill has been slowly restored, peeling away centuries of cover-ups, letting the building breathe, repairing damage and leaving it in a sustainable condition, all set for the next 500 years.

We share:

A restoration story

In 2006 Wisson Hill was functioning as a family home, although some grottiness and damage was more obvious than others. We knew that a rotten timber in the west gable wall needed attention, but the final push for action came when a starling poked its head into the kitchen, around the side of a kitchen cupboard.

As it was clear that the kitchen would be out of action for a few months during repairs, the detached wash house was prepared for conversion to a temporary kitchen. As this was the first part of the sixteenth century property to be restored, we were novices, taking advice from wherever we could get it, but making the sort of mistakes we would not repeat later.

This Blue Lias stone building had been used as a home office and we found some good things and some bad things:

Good things:

An old, disassembled wooden window frame painted white, leaning against a wall, with glass panes intact. Beside it are some wooden planks and debris on the ground.
  • Under the carpet and concrete screen was a complete and original flagstone floor, with stones cracked in many places, from hard rural usage
  • A washing copper still sat in its original position, complete with grate below and flue above – it could have just been fired up and used as it was
  • In another corner a shaped wall and some sort of sump below ground level looked like a larger washing – or probably brewing – vessel had been removed
  • In the same corner, a small original window had been filled in, but not very convincingly, so easy to reverse
  • The large, white-painted west-facing window, rotten at the bottom, turned out to be an old, pegged oak frame, with witness marks for leading bars
  • After the oil boiler and cupboard doors were removed, the fireplace was original, from brick hearth to pot bar and chain

Bad things:

  • A chimney fire had caused the chimney stack to collapse towards the roof, actually starting to push the pretty ridge tiles off the other end of the roof
  • The roof was in a bad way, from rotten wall plate to rafters to missing and broken tiles
  • The previous owners had cut a doorway through the thick stone wall to the 1960s structure…and through the wall plate, leaving no support for the roof

We knew we needed to try to use traditional materials, but had not yet found the right builders to work with, so repairs used a mixture of conventional softwood, wool insulation, gypsum plasterboard and limewash.

Major restoration work

Starting work on the kitchen was where the dramatic stuff started. Like pulling the proverbial thread, a minor timber repair very quickly resulted into two faces of the original sixteenth century house stripped back to the timber frame, some of which turned out to be missing! Again, good first, then bad:

  • A remarkable and original timber frame structure was there, under all the layers
  • Many of the timbers showed carpenters’ marks and burn marks, soot deposits and various witness marks from previous windows
  • Another blocked window was revealed, this one a mullioned frame above the staircase
  • Original, unaltered (or lifted) flag stones made up most of the ground floor
  • Major work in the 1960s, when a brick extension was built and the older building modernised, had actually been fairly gentle on the older structure
  • Neglect, cement render and piled up earth had caused some of the timbers, particularly near ground level, to rot
  • Repairs to previous rot were crude, mostly using single course brickwork, where posts and sole plates had rotted away
  • Some parts of the timber frame structure were unstable, particularly the cross-passage beam which was ‘supported’ by a window frame, which was bowing under the strain

The extent of restoration is best shown through before and after photos.

After the west and north faces of the main two-bay building and gable were structurally complete, we and our funds were absolutely exhausted. It was nearly a decade later that essential repairs drove another burst of restoration.

From one little roof leak…

Two storeys down, brown water was collecting in china dishes in a cupboard in the study – not a good sign. It was apparent that a long-standing, intermittent leak, somewhere along a roof gulley, was causing water to get in. Very hard to reach from inside or outside, it seems that leaks at the same point had been causing damage for decades.

After a few unsuccessful efforts to track down the source, Roy the roofer located and dealt with the inadequate leadwork but, as it turned out, that was just the easy bit. Like-for-like replacement of water-damaged elm floorboards in the corner of the gable bedroom was fairly straightforward and, luckily, the vertical timbers and panels adjacent to the leak had been spared. However, investigations exposed the fact that the gable wing purlins were balanced on a couple of cantilevered piles of bricks.

This alarming situation was dealt with by heroic raising of a beam of green oak to ceiling level, secured into the stone chimney breast and notched to hold the purlins. This precarious situation was obviously not new and Wisson Hill holiday guests can see a thin piece of paler timber which had optimistically been nailed to the truss, hoping that an inch-wide fork of timber would take the weight of the roof.

The tie beam of the central truss in the gable bedroom was apparently cut through centuries ago. The stump above the bedhead and its counterpart behind the door show that it would have been very low and it seem likely that Victorian inhabitants wanted to raise headroom to about 7 feet. Cutting the tie beam seems to have allowed a certain amount of rood spreading over the centuries and some additional ties between facing rafters were added just above the ceiling.

The rest of the gable bedroom restoration involved oak lathing and lime plastering, carefully building up the layers as each one dries to the right point. Careful work had revealed some early 19th century graffiti, which we were able to conserve for holiday guests to see.

Moving the bathroom

There were a number of drivers to moving the bathroom from what is now the middle bedroom to its current location:

  • The existing bathroom was fully tiled and artexed but it was obvious from the other side of two walls that there was an old timber structure to expose
  • There was no shower in this ‘family bathroom’ as there was not enough headroom and the sloping floor made drainage challenging
  • Existing plumbing was damaging and putting the original structure at risk
  • As a sunny, south-facing room, it would make a better bedroom than the north-west bedroom, of a similar size
  • Plumbing and electrical cabling could be minimised and surface-mounted in the new space
  • A local electrically-heated hot water tank in the new room would allow rationalisation of plumbing, including through the vulnerable attic space.

Stripping away the tiling and modern plastering revealed the original Tudor wall plate and brace, now integrated into the stone south-facing wall, since the timber frame was removed from that elevation, probably within a century of original construction. The elm partitions revealed had been hacked for plastering in some places, but a beautiful apotropaic burn mark was exposed. Although a large amount of the very old, wide elm floor boarding remains, the rotted ends butting up to the modern boarding show that the main section of what is now the floor of the middle bedroom was lost some time ago.

Restoration work has been carried out with Listed Building Consent.

Before and after photos give an idea of the impact of restoration.

Restoration address book

These are the specialists who have made restoration of this historic building possible:

Carpentry and general building: Castle Brothers, particularly Richard Castle, who has carried out all the ‘gentle touch’ repairs to the timber frame which have saved so much of the original structure.

Lime plastering and stonework: Castle Lime Plastering. Jeremy and Bill have carried out sympathetic lime plaster and mortar work, retaining and protecting a huge amount of historic detail.

Leaded windows: https://www.norgrovestudios.co.uk/. Ben repaired the existing handmade glass windows and created new leaded window panels with handmade glass. The techniques and materials used are traditional and the effect – by day and night – is correspondingly authentic.

I am also grateful to the various plumbers and electricians who have been patient, careful and have gone the extra mile with their work, but would probably not thank me for recommending them for more jobs on similarly ancient properties!

See the restoration for yourself

Wisson Hill is now available for holiday rental so you can see the restoration and – if you like – ask the owner any questions about finds, techniques, compromises and costs.

Sixteenth century timber frame houses were built using techniques and materials that are very different to what is used now. Some builders have experience working with old buildings and are more confident making carrying out significant structural repairs with minimal fuss. Understanding where loads need to be supported and how forces apply through a timber frame is essential. Another aspect is the use of appropriate materials. Early modern houses were designed to breathe, so repairs must be carried out using lime-based mortars and plasters. Not all builders are confident using these traditional approaches, although they are no harder than their modern equivalents.

That depends on the condition of the house, the number of consents that will be required and budget available. Fast restoration is also not always the best, as there are more unknowns when repairing an old building and the restoration approach may need to be adjusted along the way. Also traditional materials can take longer to settle, such as green oak moving after installation or lime plaster layers drying sufficiently for the next layer. If possible, a slow approach to restoration can be rewarded by full appreciation of the structure and finds that are revealed during the journey.